Browse by category Quicklinks

Selected Case Study

During the last decade we have introduced a variety of LED signals that provide a long and reliable operational service. The very low failure rates (over 40 million fault free operational hours for GPLs) and slow degradation of the LED intensity, allowed our design engineers to consider how to design the next generation of signals.

The next challenge was to enable the industry to benefit from the signal performance and reduce the whole life costs and operational risks even further.

Telephone
+44 (0)1302 731 400
Website
Address
Jupiter Building, First Point, Balby Carr Bank, Doncaster, DN4 5JQ
View in Google Maps

Other Case Studies from this Company

Working with Carillion Rail to solve the Productivity Puzzle Working with Carillion Rail to solve the Productivity Puzzle
East London Line Maintenance Project - Delivering the Ten-Year Asset Investment Requirements Plan...
Freightliner - SmartServe Solution Freightliner - SmartServe Solution
Unipart Rail has a number of successfully managed depot stores in the UK and Australia but follow...
VolkerRail - Supply Chain Services VolkerRail - Supply Chain Services
VolkerRail were undertaking a Christmas ‘blockade’ - where a section of track is clos...
Metro Trains and INVER Engineering Metro Trains and INVER Engineering
Metro Trains Melbourne (MTM), operates a fleet of 72 Siemens trains, which have completed 1.2mill...
Off-site Factory for Overhead Line Off-site Factory for Overhead Line
Network Rail’s Stafford Area Improvements Programme seeks to improve capacity, reliability ...
Network Rail - Point Machine Service/Refurbishment Network Rail - Point Machine Service/Refurbishment
Network Rail needed to realise cost reductions within their supply chain and identified point mac...