Browse by category Quicklinks

Selected Case Study

As part of Networks Rails electricfication of the main Bristol to Birmingham Line Three Shires Ltd worked a long side J Murphys and Son on the new Yate to Wapley footbridge.

Three Shires Ltd under took the fencing package which included:

Bespoke Palisade made to suit the Bridge

Bespoke Base plate mounted Timber post with Stock fence and line wire

Made to measure GRP non conductive Fence panels on the bridge

Chainlink fence installed on the bridge embankments

7 line wire and stock fence to Network Rail Access paths

Install of Network Rail access gates

Since the opening of the footbridge, the project has drawn a lot of attention from local resident groups, the local media and has been put forward for a national award.

Telephone
01664 444 604
Website
Address
Three Shires Ltd, Piper Hole Farm, Eastwell Road, Scalford, Leicestershire, LE14 4SS
View in Google Maps

Other Case Studies from this Company

Dog Trust, Evesham Dog Trust, Evesham
Three Shires Ltd were invited to tender and subsequently carry out the Great Crested Newt Exclusi...