A subsea oil and gas company contacted us with an enquiry for five sea water cooling pumps for use on their oil and gas rig, to cool the winches that are continuously used. They needed these pumps on a quicker than the usual 6-8 week lead time that most bespoke manufactured pumps run at.

Key Challenges:

  • Pump to be under continuous operation.
  • Able to handle sea water without corroding over time.
  • Quicker than standard lead time required.

Solution:

The natural choice of pump when pumping water is a centrifugal pump. We supplied these centrifugal pumps in bronze, ensuring all wetted parts that come into contact with the seawater are non-ferrous and will not corrode overtime.