Russetts was approached in 2011 regarding the refurbishment of Buscot Park’s famous Grade II listed Peto water garden feature, which consists of a series of formal ornamental ponds, weirs, cascades and canals.

The brief was to install a suitable pond liner ensuring it terminated at water level to avoid covering the original stone features. Due to the shape and 135m length of the water feature, it meant that the liner would have to be completely fabricated onsite to ensure a perfect fit. It was decided the most suitable material to line the water garden feature was 1.2mm Flagon GeoP TPO membrane with 400g/m2 protective geotextile underlay.

Once the water feature had been drained and cleared a 3mm chase was cut into the existing stone work at water level around the entire circumference of the feature. This chase would allow an L shaped laminated metal strip to be inserted inside the chase and hang vertically down the wall allowing the Flagon TPO membrane to be welded to it. The chase was then sealed with a waterproof and fish friendly mastic sealant.

Each section of the water feature was completely finished by welding in the base sheets and sealing the liner at water height before moving onto the next section. The base was mechanically secured to the original structure to ensure there was no uplift of the liner as there was no guarantee that water would not seep in under the liner through the original construction in adverse weather conditions. The Grade II listed status would not allow any modern sealing solutions to be applied to the original construction of the feature which would now be preserved under the new lining system.

The interlinking weirs were lined in preparation for new concrete flag stones to be place on top allowing the water to cascade into the section below. Each section had a 25mm dia pipe protruding through each weir with a removable plug to allow draining of each section if required. RDL’s experienced installers were able to fabricate the pipe sleeves using off cuts of the Flagon TPO lining membrane thereby reducing the overall costs of the project by not having to purchase expensive pre-formed sleeves.

The installation of the 1.2mm Flagon GeoP TPO lining membrane took a total of thirteen days from start to completion. There was no disruption to the surrounding park features as all the preparation of the lining materials and fabrication was carried out within the boundaries of the water feature. Approximately 1100m2 of Flagon TPO membrane was used.

On completion of the installation there was some remedial work to be carried out by Buscot Park grounds staff before was the water could be turned on and the famous Peto water garden feature including the Dolphin bronze fountain was put back into service which was just in time for the seasonal opening for the visiting public.

Telephone
0870 770 2800
Website
Address
27 Burners Lane, Kiln Farm, Milton Keynes, MK11 3HA
View in Google Maps

Other Case Studies from this Company

Russetts Fabricate Large Pond Liner On Site Russetts Fabricate Large Pond Liner On Site
Russetts were recently involved in job at a private house to line a large pond that had a bridge ...
Pond Liner Installation at Botanic Gardens, Bristol Pond Liner Installation at Botanic Gardens, Bristol
Russetts Developments were contracted to repair a leaking pond which formed part of a lake that f...
Russetts renovate established pond Russetts renovate established pond
Russetts Developments Ltd supplied EPDM 1mm pond liner and Geotextile underlay for the lining of ...
See more